Other updatesNov 23, 2026 · 10:32 AM ET
Blue Moon reports initial ore sorting results for Springer mine
Blue Moon Metals announced initial testing results for particle ore sorting on tungsten mineralization from its Springer tungsten mine in Nevada. The study showed grade upgrades and metal recoveries across high, medium, and low-grade composites, helping evaluate pre-concentration potential before processing at the mill.
- Testing showed a 1.3x to 3.4x uplift of tungsten grades with 93.3% to 97.5% recovery.
- Mass rejection of low and medium-grade material ranged from 25.1% to 71.7%.
- Additional ore sorting and engineering studies are planned for 2027.
Reads as positive for shareholders.
Written by software from the company's own filing, so it can be wrong or leave something out. The filing is the record. This is news, not investment advice.