Other updatesNov 23, 2026 · 10:32 AM ET

Blue Moon reports initial ore sorting results for Springer mine

Blue Moon Metals announced initial testing results for particle ore sorting on tungsten mineralization from its Springer tungsten mine in Nevada. The study showed grade upgrades and metal recoveries across high, medium, and low-grade composites, helping evaluate pre-concentration potential before processing at the mill.

  • Testing showed a 1.3x to 3.4x uplift of tungsten grades with 93.3% to 97.5% recovery.
  • Mass rejection of low and medium-grade material ranged from 25.1% to 71.7%.
  • Additional ore sorting and engineering studies are planned for 2027.

Reads as positive for shareholders.

Read the SEC filing ↗Form 6-K, filed Nov 23, 2026

Written by software from the company's own filing, so it can be wrong or leave something out. The filing is the record. This is news, not investment advice.

More from Blue Moon Metals Inc.

Nov 19 · 8:54 AM ET

Blue Moon gets plan of operations approval for California mine

Blue Moon announced that the U.S. Bureau of Land Management has approved the plan of operations for its Blue Moon zinc, gold, silver and copper mine in Mariposa County, California. The company stated this is the principal permit required to construct and operate the mine, where underground exploration decline construction and infill drilling are currently underway.

Nov 12 · 4:33 PM ET

Blue Moon Metals posts third-quarter net loss of $25.4 million

Blue Moon Metals Inc. reported a net loss of $25.4 million for the three months ended September 30, 2026, compared to a net loss of $9.8 million for the same period in 2025. For the nine-month period ended September 30, 2026, the company posted a net loss of $83.0 million, up from $17.6 million a year earlier.