Other updatesNov 12, 2026 · 4:51 PM ET

ARIS Mining releases prefeasibility study for the Toroparu Project

Aris Mining Corporation announced the filing of a technical report detailing a prefeasibility study for the Toroparu Project located in the Cuyuni-Mazaruni Region of Guyana, with an effective date of November 12, 2026. The report includes estimates on production, costs, mineral resources, and economic results.

  • The technical report covers the prefeasibility study for the Toroparu Project in Guyana.
  • The report has an effective date of November 12, 2026.
Read the SEC filing ↗Form 6-K, filed Nov 12, 2026

Written by software from the company's own filing, so it can be wrong or leave something out. The filing is the record. This is news, not investment advice.

More from Aris Mining Corporation

Nov 12 · 5:05 PM ET

ARIS Mining announces positive prefeasibility study results for the Toroparu Gold Project

Aris Mining Corporation announced positive prefeasibility study results for its Toroparu Gold Project in Guyana, outlining an open pit mine expected to produce 5.6 million ounces of gold over 29 years. The base case economics show a $2.8 billion after-tax net present value and a 31.5% internal rate of return at a gold price of $3,600 per ounce, with an initial funding requirement of $1.005 billion.